Alstom’s leading metro, signalling and maintenance solutions power Indore’s extended network
Alstoms leading metro, signalling and maintenance solutions power Indores extended network
Alstom, a global leader in smart and sustainable mobility, today celebrates the commencement of revenue operations for the next phase of the Indore Metro Yellow Line. Alstoms contract with Madhya Pradesh Metro Rail Corporation Limited (MPMRCL) encompasses the delivery of 52 Movia metro trainsets along with 15 years of comprehensive maintenance services, including 7 years maintenance of the signalling train control, and telecommunication systems. Alstom is the only multinational sustainable mobility provider in India to have a comprehensive portfolio of offerings to meet customer needs and continues to be a strategic partner in supporting Indias rail revolution.
Olivier Loison, Managing Director – Alstom India said: “This major milestone expands the reach of the Indores metro network, following the successful launch of the super priority corridor with Alstoms solutions. We are proud to partner with Madhya Pradesh Metro Rail Corporation Ltd. in this project delivering the trains, advanced signalling systems and maintenance, from India. This marks our commitment to providing sustainable, efficient, and smarter transit systems to the people of Indore.”
In alignment with the Government of Indias Make in India and Atmanirbhar Bharat initiatives, Alstoms solutions for Indore are fully developed, manufactured and delivered in India. With six industrial sites and five major engineering centres, Alstom has all capabilities necessary to cater to domestic as well as international project needs. Alstom also remains deeply committed to strengthening its local sourcing and supply chain ecosystem.
Leading Alstom solutions transforming urban mobility in Indore
The Indore Metro Yellow Line spans 31.5 kms in total, with a 16-station mainline covering 16.72 km currently under operation. The Yellow Line deploys 10 Alstom-equipped trainsets, operates at Grade of Automation 1 (GoA1) with Automatic Train Protection (ATP) on the mainline, and is supported by the Gandhinagar Depot and Test Track. With 23 out of 25 trainsets already delivered to Indore, Alstom continues to execute on its delivery commitments, reinforcing its deep partnership in transforming the mass transit landscape of Madhya Pradesh.
Indores metro trainsets are designed and manufactured at Alstoms rolling stock manufacturing facility in Savli, Gujarat. Engineered for safety, sustainability, and passenger comfort, the trains operate at a top speed of 80 km/h. Each 3-car configuration accommodates 144 seated and 981 standing passengers, maximizing space and accessibility featuring dedicated areas for passengers with reduced mobility.
The metro trainsets are powered by energy-efficient traction systems equipped with regenerative braking, significantly reducing energy consumption, while ambient lighting and smart light solutions further optimise energy use.
The Train Control and Management System (TCMS) is integrated with an automatic track inspection system, guaranteeing reliable and high-speed data transmission. Security is bolstered by continuous CCTV surveillance, intelligent features such as unattended object identification and empty train detection, and direct communication channels with the train operator and the control centre.
To manage passenger demand, maximize throughput, and optimize operational efficiency, Alstom has equipped the Indore Metro with Urbalis Forward, its next-generation CBTC signalling system. Installed on 190 metro lines in 32 countries, this system ensures safe, fluid, and high-frequency train operations with minimized wait times, paving the way for future capacity growth.
As the market leader in rail maintenance service and life cycle management, maintaining over 36,000 vehicles around the world, Alstom will keep the system running at peak performance over the 15-year maintenance agreement, supported by its FlexCare Perform solutions, playing a crucial role in ensuring high availability and stable train operations.
- Alstoms world-class Movia metro trains and advanced Urbalis Forward CBTC enter revenue service on Indores next metro phase.
- Alstoms leading solutions transform daily travel for over 6 million citizens across Indore and the metro-connected city of Bhopal, ensuring safe, reliable, and sustainable mobility.
- Fully designed, manufactured and delivered in India, Alstoms rolling stock, digital and lifecycle management capabilities perfectly meet the Make in India & Atmanirbhar Bharat initiatives
Alstom, a global leader in smart and sustainable mobility, today celebrates the commencement of revenue operations for the next phase of the Indore Metro Yellow Line. Alstoms contract with Madhya Pradesh Metro Rail Corporation Limited (MPMRCL) encompasses the delivery of 52 Movia metro trainsets along with 15 years of comprehensive maintenance services, including 7 years maintenance of the signalling train control, and telecommunication systems. Alstom is the only multinational sustainable mobility provider in India to have a comprehensive portfolio of offerings to meet customer needs and continues to be a strategic partner in supporting Indias rail revolution.
In alignment with the Government of Indias Make in India and Atmanirbhar Bharat initiatives, Alstoms solutions for Indore are fully developed, manufactured and delivered in India. With six industrial sites and five major engineering centres, Alstom has all capabilities necessary to cater to domestic as well as international project needs. Alstom also remains deeply committed to strengthening its local sourcing and supply chain ecosystem.
Leading Alstom solutions transforming urban mobility in Indore
The Indore Metro Yellow Line spans 31.5 kms in total, with a 16-station mainline covering 16.72 km currently under operation. The Yellow Line deploys 10 Alstom-equipped trainsets, operates at Grade of Automation 1 (GoA1) with Automatic Train Protection (ATP) on the mainline, and is supported by the Gandhinagar Depot and Test Track. With 23 out of 25 trainsets already delivered to Indore, Alstom continues to execute on its delivery commitments, reinforcing its deep partnership in transforming the mass transit landscape of Madhya Pradesh.
The Train Control and Management System (TCMS) is integrated with an automatic track inspection system, guaranteeing reliable and high-speed data transmission. Security is bolstered by continuous CCTV surveillance, intelligent features such as unattended object identification and empty train detection, and direct communication channels with the train operator and the control centre.
To manage passenger demand, maximize throughput, and optimize operational efficiency, Alstom has equipped the Indore Metro with Urbalis Forward, its next-generation CBTC signalling system. Installed on 190 metro lines in 32 countries, this system ensures safe, fluid, and high-frequency train operations with minimized wait times, paving the way for future capacity growth.
